Installing bulky ventilation ducting with an ELC-730/R lifter

Installing bulky ventilation ducting with an ELC-730/R lifter
JANUARY 18, 2023

Ventilation equipment is not usually very heavy, but it is bulky, and difficult to lift to the ceiling to be installed.  Fortunately, GUIL makes ELC lifters, which lift and hold equipment like this, allowing the workers to prepare the ceiling to receive the parts and to fasten them in place.  The material lifter ref. ELC-730/R can take loads of 125 kg to over 4.50 metres in height, holding the load in position while it is fastened in place.  The installers don’t have to take a large, awkward duct junction box up a ladder, they can just concentrate on fixing it in place while it stays on the ELC-730/R’s platform.

GUIL: 40 years of experience back us up

ducting installation for air conditioning (TECHNIKNTB)
duct installation (TECHNIKNTB)

KO-MAT is a Polish HVAC installation company that bought their ELC-730/R from our Polish distributor Technik NTB.  Like any HVAC installers, KO-MAT have to lift and connect air-conditioning units or ventilation equipment every day, and they greatly appreciate the time and effort saved by using a lifter to do the heavy lifting, as well as the safer working conditions that are the result of not having to handle the equipment on ladders.

Let GUIL do your heavy lifting